Larger lots and a mix of houses
Rio Linda is unincorporated Sacramento County land that was once part of the 1844 Rancho Del Paso grant. It was subdivided around 1912 and was long known for small farms, poultry and larger lots. Drive through 95673 today and that history is still visible: older houses on deep parcels next to much newer homes, outbuildings, and the occasional place that has been added onto more than once.
For tile, that mix means we do not assume anything about a Rio Linda house before we see it. A newer home here is typically on a concrete slab. Some older homes sit on raised wood floors over a crawlspace, and that changes the prep more than any other single factor.
Why a raised wood floor matters for tile
Tile and grout do not bend. On a slab, the concrete is rigid and the work is about cracks, flatness and moisture. On a raised floor, the tile is sitting on joists and wood sheathing that flex a little every time someone walks across the room. If the floor flexes too much, grout cracks first and tiles follow.
What we check
- Joist size, spacing and span, from the crawlspace if there is access. A bouncy floor is a sign the structure needs help before tile goes on.
- Subfloor type and thickness. Older floors may be plank sheathing or a single thin layer of plywood, which is generally not enough on its own for tile.
- Condition around old bathrooms, where a long-term leak at a toilet or tub can soften the subfloor. We look for it before planning anything.
What the prep can involve
Depending on what we find, a raised floor may need an added layer of plywood glued and screwed to the existing subfloor, then a tile underlayment: cement board screwed on a tight pattern, or an uncoupling membrane set in thinset. Stone and large-format tile ask more of a wood floor than ceramic does. If a floor needs structural work beyond that, such as sistering joists, we tell you so a carpenter can do it before we tile.
The added layers raise the finished floor. We measure door clearances and transitions to adjoining rooms at the estimate stage, so the height change is planned ahead. Where tile meets an old wood floor in the next room, the two rarely end up level, and a tapered threshold is often the neatest way to join them.
Wood framing also responds to seasonal humidity in a way a slab does not, which makes movement joints more important. We leave a gap at every wall and fill it with caulk, not grout, and we follow the underlayment manufacturer's rules for fastener spacing and seam treatment.
Showers on a wood-framed floor
A shower on a raised floor needs the same waterproofing as one on a slab, which our bathroom and shower tile page walks through, plus attention to what is under the pan. The subfloor has to be sound and stiff, the drain has to be set to the right height for the pan, and the joists around it should be checked for past water damage. A slow leak under a tub can go unnoticed in a crawlspace for a long time.
One Rio Linda bathroom on this site is a shower rebuilt from the framing, and it is a fair picture of how far back a rebuild can need to go once the old walls are open.
Entries, mudrooms and laundry floors
Many requests here are for the rooms that take the outdoors: the back entry, a mudroom, the laundry. On a larger lot those floors see boots, yard dirt and animals more than a hallway in a tract house does.
For those rooms we suggest a dense porcelain with some surface texture, since it resists stains and is less slippery wet than a polished face. Grout choice matters as much as the tile, and the options are in the questions below. At an exterior door, the tile should stop at the threshold with a sealant joint, and the threshold itself should shed water outward.
Other work we do in Rio Linda
- Kitchen floors in older houses where the subfloor needs attention first, and in newer houses where it is a straight replacement.
- Bathroom rebuilds, including converting a tub to a walk-in shower with a pre-sloped pan.
- Long floors through the living areas, like the marble-look floor through the living areas we laid here.
- Removing old tile and getting the floor ready for its next finish, covered under tile removal and floor prep.
Newer Rio Linda homes and some older ones are slab-on-grade, and on those the prep is the slab work described on the removal page: old tile and thinset off, cracks treated, the floor flattened for the tile you choose. General floor and wall work is on our residential tile installation page.
Crawlspaces, lots and access
- Larger lots often make access easy. We can usually park close and set up the saw outside, away from the house.
- If you have a crawlspace, tell us where the access hatch is and clear a path to it. Looking underneath is part of a proper estimate on a raised floor.
- A raised floor that needs extra layers adds days to a floor job compared with a slab, and the added height can mean trimming doors. We plan both at the estimate.
Rio Linda is about 5 miles from our shop on Del Paso Road. Our first visit here includes a look at what the floor is built on, along with the measurements and photos.


