Stage one: open to the framing
The first photo shows the room stripped right down. The walls are open to the wood studs, with faced insulation in the exterior wall, and the ceiling is open to the joists and framing above. The old tub is still in the alcove with a ladder standing in it, and a step stool and a boxed fixture sit on the floor.
Opening a bathroom this far is the moment to look at everything that is normally hidden: whether the studs are straight, whether there is old water damage at the bottom plates, how the valve and drain are placed, and whether the framing at the shower walls will carry board and tile without flexing. Straightening a stud costs very little at this stage and a lot once tile is on it.
Stage two: board, base and ceiling
The second photo is a later stage. The tub is gone and a shower base sits in the alcove, still under its printed protective cover. The ceiling is new drywall with recessed lights and an exhaust fan. Outside the shower the subfloor is bare OSB, with a toilet flange set near the shower, and a window in the side wall of the room is trimmed in board.
The room walls are closed in with green moisture-resistant gypsum board. That is a reasonable board for bathroom walls outside the shower, but green board is not a wet-area backer. Inside the shower, what keeps water out of the wall is the pink membrane, and that membrane has to be rated for whatever board it covers. Many installers would put cement board or foam board behind the shower walls instead. The photo does not show which board is under the pink coat.
Stage three: the pink membrane
Inside the shower the walls are rolled with a bright pink liquid waterproofing membrane, carried up the back and side walls, a little past the alcove opening, and down to the edge of the base. Liquid membranes go on in coats to a set thickness, and the strong color makes thin spots easy to see. Seams and inside corners are normally reinforced with fabric before the full coats go on, and the membrane has to lap onto the flange of the base so water that gets through the grout runs down into the base. The valve outlet on the right wall comes through the membrane and gets sealed as well.
Before the first tile
The next step is a water test: drain plugged, water left standing, often for 24 hours, to prove the membrane and the drain connection hold. The membrane is the waterproof layer. Tile and grout on their own are not. Only after the test does the wall tile go up, with the valve trim fitted last. The bathroom and shower tile page covers the full sequence.