Tile for offices, shops and restrooms

We handle light commercial tile in and around Sacramento: office suites, small retail spaces, restrooms and break rooms, scheduled so your business can keep running.


Restroom with grey square floor tile and a grey tile wainscot with grab barsRestroom with dark plank floor tile, grey wainscot and a hexagon-pattern feature wall

The scale of work we take on

We are a tile installer, not a large commercial contractor, and our commercial work is sized to match. That means small and light commercial jobs: an office suite, a retail floor, a staff restroom, a break room, a lobby, or a tenant improvement where the tile is one part of the job. The office parks along I-5 in South Natomas have spaces like this, as do the small retail and office buildings across the rest of the area we cover.

If your project is a new multi-story building or a large chain rollout, you need a firm with a bigger crew. If it is a few hundred to a few thousand square feet of floor, or a set of restrooms that need to be redone properly, that is the kind of work we are set up for.

The tile craft is the same as in a house. What changes in a commercial space is the traffic, the cleaning chemicals, the schedule, and the number of people who need to walk on the floor the next morning.

Working around your business hours

Most small businesses cannot close for a week, so the job is planned around when the space is in use. That might mean starting after closing, working weekends, or tiling one section at a time while the rest of the space stays open.

Before work starts, we walk the space with you or your property manager and agree on the hours, the access, where materials and tools can be kept, and which areas must stay usable each day. Noise is part of that conversation. Removing old flooring and grinding a slab is loud, so that work usually goes in the hours when the fewest people are around.

Curing time matters in the schedule. Thinset and grout need time before they can take heavy foot traffic or rolling loads like carts and chairs. Some fast-setting mortars and grouts shorten that wait, and we use them where the schedule calls for it. You will get a plain answer on when each area can reopen and what it can handle at that point.

Phasing a larger floor

On a floor that has to stay partly open, the space is divided into phases. Each phase is closed off, demolished, prepped, tiled and grouted before the next one starts. The joins between phases fall on planned lines, usually at a doorway, a column line or a movement joint, so the finished floor does not show where one night's work ended. Temporary ramps or edge protection keep the open side safe while the floors are at different heights.

Slip resistance and tile choice

A tile that looks fine in a living room can be a problem in a shop entry on a rainy day. For commercial floors, slip resistance is part of choosing the tile from the start. The current US measure is the dynamic coefficient of friction, or DCOF, tested under ANSI A326.3 and published by manufacturers for each tile. For level interior floors expected to be walked on when wet, the commonly cited minimum is a wet DCOF of 0.42. That figure is a floor, not a guarantee of safety, and entries, restrooms and break rooms are where it matters most.

We are not the final authority on what your building requires. If your architect, landlord or insurer has a specification, it takes priority and we build to it. Without one, we point out where a polished or glossy tile is a poor choice and suggest a textured or matte finish with a published wet DCOF for wet zones. Walk-off mats at entries help too, but they do not replace the right tile.

Porcelain is the usual choice for commercial floors because it is dense and hard. Through-body or color-body porcelain carries its color into the body of the tile, so a chip shows far less than it would on glazed tile, which helps where carts, dollies and dropped stock are part of daily life.

Grout and setting for heavy traffic

The grout decision in a commercial space is driven by the cleaning. A restroom or break room mopped every night with strong cleaners will stain, wear and hold odor in porous cement grout. For those rooms we usually recommend epoxy or urethane grout. Epoxy is very hard and stands up to chemicals. Urethane is easier to work with and also resists stains. Neither needs sealing, and both cost more and take more care to install, which pays off where the floor is cleaned hard and often.

Heavier traffic also puts more demand on the installation. Full mortar coverage under every tile matters more when a floor carries hundreds of people a day and the occasional pallet jack, so coverage is checked by lifting tiles as the work goes. A hollow tile in a busy corridor will crack sooner or later. When one does, the repair is much easier if spare tile from the same production lot was set aside at the end of the job, so we recommend keeping some on site for that.

Movement joints in large areas

Large tiled areas move. Concrete shrinks and expands, sunlight through a storefront heats one part of the floor more than another, and buildings settle. Without places to relieve that movement, tile can tent up, crack or come loose.

The TCNA Handbook's movement joint guidance, known as EJ171, calls for joints at the perimeter, at changes of plane, over joints in the slab, and in the field of the floor. For interior floors it is commonly cited as field joints no more than about 25 feet apart in each direction, and about 12 feet where the floor gets direct sunlight or moisture. A space with a full glass storefront or skylights may need to be treated closer to an exterior floor. These joints are lined up with grout lines and filled with a flexible sealant that matches the grout, so they read as part of the pattern. Existing control joints and cold joints in the slab are carried up through the tile, never tiled over.

Restrooms and accessible layouts

Commercial restrooms get more use and harsher cleaning than any room in a house. Floors and walls are tiled with that in mind: porcelain with suitable slip resistance, epoxy or urethane grout, a cove or tile base so mop water does not reach the drywall, and floor slope toward the drain where there is one.

Many commercial restrooms also need to meet accessibility requirements. Those cover things like clear floor space, turning room, door clearances and the height of transitions. Tile is part of that, because thresholds and changes in floor height have limits, and the floor surface needs to be firm, stable and slip resistant. The design and code compliance belong to your architect or designer and the building department. Our part is to build the floor to those drawings: flush or properly beveled transitions, correct slopes, and a finished surface that matches what was specified.

If you are also redoing showers in a gym, a clinic or a small hospitality space, the waterproofing approach is the one described on our bathroom and shower tile page, adjusted for heavier use.

What comes up before the new tile goes down

Commercial floors rarely come to us as bare concrete. The usual layers are vinyl composition tile, carpet with its glue, sheet vinyl or old ceramic, sometimes more than one of them. All of it comes off down to sound concrete, and the adhesive matters most: residue left on the slab can stop thinset from bonding, and some older black adhesives need testing for asbestos before anyone grinds them.

Office and retail slabs also tend to have saw-cut control joints, patched trenches where plumbing or power was run, and areas that were covered by fixtures for years. Those are mapped before layout so the movement joints and the tile pattern work with them. The flatness checks, crack treatment and self-leveler work that follow follow the method on the tile removal and floor prep page. If a slab shows signs of moisture, we test and talk with you before going further.

Cleanup and handover

Dust is contained during demolition with shrouded grinders on vacuums and plastic walls around the work area, and finished surfaces and fixtures are covered. Debris goes out at the end of each shift, not into a pile by the back door.

When the tile is done, grout haze is cleaned off, every movement joint and transition is checked, and we walk the space with you. You get the tile and grout details for your records, plus basic cleaning guidance for the maintenance crew. To set up a walk-through of your space, call (916) 891-4171.

Questions about commercial tile work

Can you work as a subcontractor under our general contractor?

Yes, for small and light commercial jobs. On a tenant improvement the tile usually follows framing, plumbing and electrical rough-in and comes before fixtures and paint. We work from the general contractor's schedule and drawings, confirm the tile, grout and slip resistance against the specification, and flag anything on site that does not match, such as slab height at a door or a drain in the wrong place, before tiling.

How far ahead should the tile be ordered?

As early as the selection is final. Stock tile can arrive within days, but special colors, sizes or trim pieces can take weeks, and trim is often what holds a job up. Order the full quantity from a single production lot to keep the shade consistent, plus spare tile for future repairs. Commercial specifications often ask for a few percent extra to be left with the owner for that reason.

What do you need from us to price a commercial job?

The floor area or a floor plan, the tile and grout specification if there is one, and what is on the floor now. Access matters too: the hours we can work, where materials can be stored and staged, and whether the space must stay partly open. A walk-through lets us see the existing flooring, door heights, drains and slab joints, which affect the scope more than the area alone.

Can new tile go over the existing vinyl tile?

Generally no. Vinyl composition tile and sheet vinyl are flexible, held down with adhesive, and not a sound base for thinset, so tile set over them can come loose with the old layer. The standard approach is to remove the vinyl and its adhesive down to sound concrete. If the vinyl is old, the tile and black adhesive should be tested for asbestos before removal starts.

Does the building need heat or air conditioning running while you work?

It helps to keep the space within the temperature range the mortar and grout makers list, during the work and while those materials cure. A space with the HVAC shut off for the weekend can get too cold in winter or too hot in summer for proper curing. Direct sun through a storefront can also overheat a section of floor, so we may cover glass or schedule around it.

How should the maintenance crew clean the new floor?

With a pH-neutral cleaner suited to the tile and grout, and clean mop water. Harsh acidic cleaners etch cement grout and can dull some tile finishes. Epoxy and urethane grout handle stronger cleaning, but the maker's list of approved products still applies. Keep walk-off mats at entries, and leave the movement joints alone during cleaning: the sealant in them is soft by design and should not be scraped.

Get an estimate

Tell us the room and roughly how big it is. We call back, come out to measure, and give you a written price.