A planned community built over two decades
Antelope is unincorporated, and most of it is a planned community of single-family homes built from the late 1980s through the 2000s. In 95843 a house's age tells you a good deal about what is in it. A home from 1989 and one from 2006 can sit a few streets apart and need quite different tile work.
Most of them are slab-on-grade, which keeps the structural side simple. The differences are in the finishes the builders used, and in how many times the house has already been updated.
Retiring a tiled kitchen countertop
Some of the older houses here still have tiled kitchen countertops, often with a tiled backsplash running up from them, and sometimes a tiled tub deck in the primary bath. When owners are ready to replace them, the order of work matters more than usual.
We remove the tiled countertops, their backer and the old backsplash down to the cabinets and the wall. The new counters are then templated and installed by whoever is supplying them. Once they are in, we come back and set the new backsplash, often full height to the upper cabinets. Its layout depends on the final counter height, the outlets and the window trim, so we plan it with you before demolition, even though the tile goes on last.
Taking off a tile countertop can tear the drywall face along the wall line. We patch what the new backsplash will cover, and anything above it may need a painter.
A tiled tub deck is a similar job on a smaller scale. The deck tile is often tied into the wall tile around it, so we look at whether it can come off on its own or whether the surround has to go too, and tell you which before you choose new tile.
The older homes: late 1980s and 1990s
The oldest homes in Antelope are now more than thirty years old. Many have been through at least one round of updates, so we see a mix: original small-format ceramic in a hall bath, a later kitchen floor laid over the original, a tub surround that has been patched. A floor laid over another floor comes up in two layers, and the slab underneath then needs grinding before it is clean and flat enough for new thinset.
Showers in these homes often turn up some water damage at the base of the walls once they are opened. We replace what is soft and rebuild with the waterproofing and 24-hour flood test described on our bathroom and shower tile page. Many owners use the rebuild to turn a tub into a walk-in shower, with a low curb, or a curbless entry where the slab and drain location allow it. The Calacatta-look corner shower with a hexagon floor is one we built in Antelope.
The newer homes: 2000s builds
Many of the newer houses still have their builder tile, the diagonal beige floor and fiberglass or cultured-marble surround described on our North Natomas page. Here the tile is typically original and still sound, and the job is replacing it with something the owner chose.
Some owners keep the original floor for now and start in the bathrooms. Others start with the kitchen backsplash, the smallest job. Either order works, as long as the eventual floor layout is planned with the later rooms in mind.
When the floor does come up, the slab is ground and leveled for the larger tile; the flatness numbers are on our tile removal and floor prep page. Large tiles are back-buttered and set in a mortar made for large, heavy tile, and leveling clips keep the edges even, as on the marble-look floor through the living areas. The white marble-look large-format floor on this site is an Antelope example.
Layout over a long run of floor
Many Antelope floor plans run one continuous floor from the entry through the kitchen and family room. That is where layout shows most. A grout line that drifts a quarter inch over thirty feet looks wrong at the far wall.
We snap the main line off the room you see first, often the entry or the line along the kitchen, and check it against every doorway before the first tile is set. We aim for no cut under about half a tile where the room allows it, and no strip under about 2 inches anywhere. Rectangular and plank tile generally reads best running along the length of the space. Perimeters and changes of plane get soft joints filled with caulk.
Where the tile stops at bedroom carpet, we try to arrange the layout so the edge falls on a full or nearly full tile, and we choose a transition strip that suits the height difference between the two floors.
Scheduling at the edge of our area
Antelope is the farthest of our service areas, about 11 miles from our shop on Del Paso Road. We plan the work to keep trips down: material delivered before we start, the saw set up in the garage for the length of the job, and as few separate visits as the curing times allow.
As a rough guide, a floor of a few hundred square feet takes several working days including prep. A shower rebuild typically takes one to two weeks of working days, because it runs through demolition and repairs, backer and membrane, the flood test, setting the tile, and cure time before grout. Many owners here take the house one room at a time, and most of the work falls under residential tile installation.


