How we work, step by step
We draw the layout before we order a single tile, then work through nine stages in order, from the first measurement to the final walkthrough.


Layout comes first
Most tile in the houses around us was put down fast by builder crews. You can see it at the doorways: a 1-inch sliver of tile at the threshold, cuts that wander along one wall, grout lines that drift off square down a hallway. None of that is about the tile. It is about where the layout started.
We find the line that matters most in the room, usually the main doorway or the longest visible wall, and work out how the cuts will fall everywhere else. If a room is out of square, we split the difference so both sides look intentional. You see the plan before we start, and we follow it.
Prep is most of the job
Good tile on a bad base fails. Most of the homes we work in are on concrete slabs, so we check them for cracks, flatness and moisture before setting anything. Older homes with raised wood floors get their subfloor checked for stiffness. Shower waterproofing is covered on the bathroom and shower page. This is the part of the work you will not see once it is finished, which is why we photograph it as we go.
Where we are and who we work for
Our shop is at 2450 Del Paso Rd, Sacramento, CA 95834, near the North Natomas side of town. We install tile in homes and small commercial spaces in North Natomas, South Natomas, West Sacramento, Rio Linda and Antelope. You can read about each on our North Natomas, South Natomas, West Sacramento, Rio Linda and Antelope pages.
Most of our work is residential tile installation: kitchen and hall floors, backsplashes, and bathroom and shower tile. We also handle tile removal and floor prep on its own, and commercial tile installation for offices, restrooms and break rooms.
Many of our clients do one room at a time, and we plan for that. When we lay out your kitchen, we note where its lines will meet the next room, so a later project can pick up where this one left off.
To start, call (916) 891-4171 or email [email protected], and we will set a time to come measure.
How a job runs
9 stages, in the order they happen.
Measure and photograph
We visit, measure every wall and doorway, and photograph the room, the existing floor and the transitions to neighboring rooms. We check whether the floor is slab or raised wood, look for cracks and hollow tiles, and note door clearances. On showers we look at the valve, the drain location and any signs of water damage.
Written layout plan and estimate
You get a written plan that shows where the layout starts, which line it follows, and how the cuts fall at each wall and doorway. We aim for no cut under about half a tile where possible and avoid strips narrower than 2 inches. The estimate lists the prep, materials and steps, so you can see what you are paying for.
Ordering tile with the right overage
We work out quantities from the plan, counting the cuts it calls for. A straight lay usually needs around 10 percent extra for cuts and breakage, while diagonal or herringbone patterns usually need more. Tile should come from the same production lot so shade and size match, and we suggest keeping a few spare pieces for future repairs.
Protecting the house
Before demolition, we cover the path from the door to the work area, seal off doorways with plastic, and protect cabinets, tubs and anything else that stays. The wet saw goes in the garage or outside. If the room is your only bathroom or your kitchen, we go through the schedule with you first so you know which days it is out of use.
Demolition
We remove the old tile, thinset, surrounds or backer down to a sound base. On slabs that usually means grinding off old adhesive so new thinset bonds to concrete. If we uncover older sheet vinyl or dark adhesive that could contain asbestos, we stop and recommend testing. Debris is bagged and hauled away as we go.
Substrate, flatness and waterproofing
We fix what demolition reveals. Stable slab cracks get a crack isolation membrane. Floors for large-format tile are ground and leveled to roughly 1/8 inch in 10 feet. Showers get foam board with sealed seams or cement board under a liquid or sheet membrane, a pre-sloped pan, and a 24-hour flood test before any tile goes on.
Setting
We snap the layout lines from the plan and dry-check them at the doorways before mixing anything. Thinset is chosen for the tile and the base, with mortars made for large, heavy tile where needed. Large-format tile is back-buttered for full coverage, and leveling clips help keep lippage out of the finished surface.
Grout and movement joints
Once the thinset has cured, we grout with sanded or unsanded cement grout, urethane or epoxy, depending on the joint width and the room. Perimeters, inside corners and changes of plane get a soft joint filled with caulk rather than grout, so the tile has room to move as the house expands and contracts.
Cleanup, sealing and walkthrough
We clean off grout haze, remove the protection, and vacuum the work area. Cement grout gets a penetrating sealer once it has cured. Then we walk the room with you, check the cuts, the joints and the transitions, and go over care: what to clean with, what to avoid, and when to reseal.
Get an estimate
Tell us the room and roughly how big it is. We call back, come out to measure, and give you a written price.
- Phone(916) 891-4171
- Email[email protected]
- Shop2450 Del Paso Rd
Sacramento, CA 95834 - AreasNorth Natomas, South Natomas, Rio Linda, West Sacramento, Antelope