North Natomas TileInstallation, Sacramento

Showers rebuilt from the studs out

We replace fiberglass and cultured-marble surrounds with tiled showers that are waterproofed, flood tested and laid out before the first tile goes up.


Walk-in shower with large blue marble-look wall tile, mosaic floor and a linear drain beside a freestanding tubBathroom with a white marble-look floor, glass shower and wood vanity

Why a tiled shower is a waterproofing job first

A tiled surface is not waterproof. Porcelain itself absorbs almost no water, but grout is porous and water works its way behind the tile through grout joints, corners and fixture openings. What keeps that water out of the walls and the slab is the layer behind the tile, and that is where most of our time on a shower goes. The shower is taken back to the studs and the slab, rebuilt as a waterproof assembly, tested, and only then tiled.

The starting point here is usually a builder bathroom. A lot of them in the newer subdivisions across North Natomas and Antelope still have a fiberglass shower or tub unit, or cultured-marble wall panels, on a slab floor with 13-inch ceramic tile. In South Natomas and Rio Linda, where more of the houses are older, you are more likely to find tile over drywall or a mortar bed that has been patched more than once.

Opening the walls

The old unit or panels come out along with the drywall around them; how that is done, and how the dust is kept down, is on our tile removal and floor prep page. What matters for the rebuild is what the open walls show.

Common findings are framing that is out of plumb, no blocking where a grab bar or niche will go, a drain sitting off center, or water staining from a failed caulk joint. Framing is corrected so the walls are flat and square. Blocking goes in wherever you will want a bench, niche, grab bar or glass hardware later. Drain and valve positions are checked against the layout before the walls close up.

Many builder bathrooms also have green moisture-resistant drywall near the tub or shower. It is fine on a bathroom wall outside the wet area, but it is not a wet-area backer. Inside a shower, the walls need cement board, foam board, or a waterproofing membrane rated for use over that board.

Walls: cement board or foam board

There are two common ways to build the walls of a tiled shower, and both work when they are done right.

Cement board is rigid, strong and inexpensive. It is not waterproof on its own. Water passes through it, so in a shower it needs a waterproofing membrane over the face, either a liquid-applied membrane rolled or brushed on in coats, or a sheet membrane set in thinset. Seams and corners get reinforcing tape or fabric, and the liquid membrane goes on to the thickness the maker specifies, which is checked with a wet-film gauge.

Foam board is light, easy to cut and waterproof through its body. The seams, corners and screw heads are sealed with the system's own tape and sealant, which turns the board into a continuous waterproof surface. It is quicker to install and makes cleaner niches and benches, but it needs care at every joint because the seams are where it can fail.

The choice depends on the shower design, the wall conditions and your budget, and we explain it before work starts. What we will not do is mix parts of different systems at random. A shower is waterproof as an assembly, and the membrane, pan, drain and seams need to be designed to work together.

The shower pan and the flood test

The floor has to slope every drop of water to the drain and stay waterproof under standing water.

A traditional pan uses a pre-slope of mortar under a waterproof liner, then a second mortar bed on top, with a clamping drain that lets water reaching the liner weep into the drain. Another common method is a single sloped mortar bed with a bonded waterproof membrane on top, so water stops right under the tile. Foam pans are pre-sloped trays that come sized for standard showers and bond to a matching drain. They are consistent and fast, but they only come in certain sizes and drain positions. A mortar bed can be shaped to any footprint, which is why we often use one for odd sizes, linear drains or curbless showers.

Whatever the pan, it gets tested. The drain is plugged, the pan is filled with water up to the curb and left for 24 hours. The water line is marked, and at the end we check that it has not dropped and that nothing has shown up below or beside the shower. Tile goes on only after the pan passes. A flood test takes a day, and it is the cheapest day in the whole job: a leak found now costs that day, while a leak found after tiling means tearing the shower out. The shower rebuilt from the framing shows these stages on one job.

Niches, benches and curbless showers

A niche is a hole in a waterproof wall, so it has to be built and waterproofed as carefully as a corner. Niches are framed between studs at a height that suits you, with the bottom sloped slightly so water runs out, and every inside face and corner is waterproofed. The niche is also placed so its edges land on grout lines or on cut tile that matches the wall, never on a random sliver.

Benches are built from framing and board, from blocks with mortar, or from foam components made for the job. Like the floor, the seat needs a slight slope toward the shower so water does not sit on it, and the whole bench is wrapped in the waterproof membrane.

Curbless showers on a slab

A curbless or zero-entry shower looks clean and is easier to walk into. On a slab it is also the hardest kind of shower to build. The shower floor has to sit lower than the bathroom floor so water drains away from the room, and on slab-on-grade homes that usually means cutting and recessing the concrete, which involves the slab, the drain line and sometimes the plumbing beyond the bathroom. A linear drain and a carefully sloped floor help, and the bathroom floor near the shower usually needs waterproofing too. After looking at your bathroom we can tell you whether it suits a curbless shower and what the work would involve.

Planning the tile on the walls and floor

You stand in a shower every day and look straight at the walls, so the layout gets planned wall by wall. The back wall is centered, cuts at the inside corners are matching widths, and the top row ends on a full or near-full tile at the ceiling or at a planned line. On the floor, the tile is laid out around the drain so the cuts toward a center drain are even, or so a linear drain sits on a clean line.

Small mosaic on a shower floor follows the slope and gives more grout lines for grip; the pebble floor walk-in shower is an example. Large tile on a shower floor needs a linear drain or a single-direction slope. Large-format wall tile needs a flat wall, full mortar coverage behind it, and a non-sag mortar so a heavy tile does not slip before it sets.

Tub surrounds and bathroom floors

Many hall bathrooms have a tub with a three-wall surround. The tub flange gets waterproofed into the wall system, the tile stops above the tub edge with a gap, and that gap is filled with sealant, since the tub and the walls move separately.

Bathroom floors are usually small but have a lot of edges: the vanity, the toilet, the tub, the door. The floor is laid out to look right from the doorway, with the cut at the threshold planned. The slab under a bathroom floor gets the same flatness and crack checks as any other room.

Grout and sealant in a wet room

Every inside corner in a shower, every joint where a wall meets the floor or the tub, and every joint where tile meets glass or a different material is a change of plane. These joints move, and grout in them cracks into the familiar line in the corner. The TCNA Handbook's movement joint guidance calls for a flexible sealant at changes of plane, so those joints get a sealant matched to the grout color.

A shower floor stays damp for hours after each use, and that is what decides the grout. Cement grout works in many showers if it is sealed and resealed, but it absorbs soap residue and can hold mildew in the joints when ventilation is poor. Urethane and epoxy grouts cost more and do not need sealing, and many owners choose them for a shower used every day, especially on the floor and in niches where water sits longest.

Glass, and how long a rebuild takes

Glass is usually measured after the tile is finished, so we coordinate timing with your glass installer. Blocking for hinges and clamps goes in during framing, and the curb and jambs are kept flat and plumb so the panels fit.

A shower rebuild usually takes one to two weeks of working days, longer if a curbless floor or plumbing changes are involved. Curing time for the pan, the membrane and the grout accounts for part of that, along with the flood test day.

To have your bathroom measured and the options walked through on site, call (916) 891-4171.

Questions about bathroom & shower tile

Do I need to move out during a shower remodel?

Usually not, if you have another bathroom you can use. We seal off the bathroom with plastic, protect the path to the door and use vacuums during demolition, though some dust and noise are unavoidable on the first days. Water to the house may need to be shut off for short periods while plumbing is changed. If it is your only shower, plan on alternative arrangements for the days it is out of use.

Can I keep my bathtub and only replace the surround?

Often, yes. A steel or cast iron tub in good condition is worth keeping, and an acrylic or fiberglass tub can be too if it is not cracked or flexing. The tub needs protecting during demolition, and its flange has to be sound so the new waterproofing can tie into it. If the tub is dated in color or worn, replacing it at the same time is much easier than doing it later through finished tile.

Do I need a permit for a shower rebuild?

It depends on the scope and on where you live. Work that changes plumbing, such as moving a drain or valve, generally needs a permit. Homes in the City of Sacramento and West Sacramento go through those cities' building departments, while Rio Linda and Antelope are under Sacramento County. Check with the department for your address before work starts, and we can describe the scope for the application.

Who handles the plumbing fixtures and the shower glass?

Tile work and plumbing are separate trades. Moving a valve, changing a drain or setting new fixtures is plumbing work, and shower glass is measured and installed by a glass company after the tile is finished. At the first visit we sort out which parts fall to whom, then schedule the tile work around those trades so the valve and drain are in place before the walls close.

What makes a niche or bench add to the job?

Each one adds framing, extra waterproofing at every inside corner, and more cut tile. A niche set between existing studs at a standard height is the simplest. A niche on an exterior wall, a wide niche that needs a header, or a built-in bench with its own slope all take more time. Prefabricated foam niches come in fixed sizes, which can save work when one fits your layout.

How should I look after a new tiled shower?

Squeegee or wipe the walls after use and run the fan, so the grout can dry between showers. Clean with a pH-neutral cleaner, since acidic cleaners etch cement grout and strong chemicals can strip some sealers. If your grout is cement, reseal it on the schedule the sealer maker gives. Check the sealant in the corners once a year and replace any section that has split or pulled away.

Get an estimate

Tell us the room and roughly how big it is. We call back, come out to measure, and give you a written price.